Kian Hock · About · Contact

Design & Methodology Works

Geotechnical and structural design for earth retaining systems and excavation sequencing — the front end of a design-and-build package, or a standalone engagement.

The ERSS type, strut levels, dewatering approach and instrumentation plan are one coherent design, not four separate procurements.

Design Calculations

Design calculations and finite element analysis (PLAXIS and equivalent) for the wall, the strutting and each excavation stage.

Methodology & Sequence

Construction methodology statements and sequence drawings, so the temporary works are built the way they were designed.

Authority Submissions

Submission packages for the relevant authority. The decisions made here set which installation methods, materials and monitoring are viable downstream.