Strutting Works
The temporary internal bracing that makes an ERSS wall work — designed, supplied, installed in stages and removed as the permanent works rise.
On most deep excavations, the strut installation rhythm — not bulk-plant productivity — sets the depth achieved per week.
The System
Walers spread load along the wall, struts span between opposite walers, king posts break long spans, rakers handle one-sided geometry, corner braces take internal angles.
Staged Installation
Installed level by level as the dig deepens — typically a strut level every few metres of cut.
Removal
Removed in reverse order as the rising permanent floors take over the lateral load.
Multi-Level Strutting
Walers and struts supporting a deep excavation.
Staged Bracing
Bracing levels added as the dig deepens.
Corner Bracing
Corner braces and king posts.
Delivered by Kian Hock Engineering.