Zero Piler Installation
Sheet piles installed with 0 mm clearance to an existing structure or boundary — the Giken JZ100A Zero Piler paired with the Zero Sheet Pile (NS-SP-J).
The “zero” is clearance, not noise or vibration. Press-in characteristics still apply: no vibration of practical engineering concern, typically 60–63 dB(A).
Why Zero Clearance
Standard press-in with U or Z sheet piles needs 500–600 mm of working clearance. Most urban boundary sites can't give that up.
The Geometry
The NS-SP-J is a Hat-shape section with the interlock on the outside, so the machine grips the pile body directly. The Zero Clearance Method was co-developed by Sumitomo Metal Industries and Giken in 1996.
Before Starting
Ground movement from soil displacement during press-in remains possible — a structural assessment of the adjacent structure comes first.
Zero Piler Unit
Giken Zero Piler positioned on installed piles.
Zero Piler System
Press-in flush against an existing structure.
Delivered by Kian Hock Piling.