Metro Decking Works
Decking over open excavations so surface traffic keeps moving while the dig proceeds below.
The deck beams load the same wall the struts brace — deck, excavation and strutting are one sequence.
The Deck
Structural steel beams supported off the ERSS or independent piles, with running steel plates as the deck surface.
Under Live Roads
The enabling system for cut-and-cover work: the excavation proceeds underneath while traffic runs overhead.
Designed Together
Decking design is inseparable from the ERSS and strutting design.
Deck Framework
Steel beam grillage under the deck.
Deck Extension
Deck extended over the active excavation.
Deck Supports
Piles supporting the deck beams.
Deck Assembly
Beams and decking forming the platform.