Pre-Boring / Pre-Augering Works

Pre-drilling a pilot hole before pile installation — reducing resistance, getting through hard layers and guiding alignment in difficult ground.

Particularly relevant in Singapore's variable Old Alluvium and weathered Bukit Timah Granite, where one wall can cross very different ground.

Reduce Resistance

A pilot hole ahead of the pile lowers installation resistance.

Through Hard Layers

Gets the pile through cobbles and weathered rock that would stall the hammer or the press.

Guide Alignment

Keeps the pile on line where the ground would otherwise deflect it. Pairs with both vibratory and press-in installation.

Site Setup

Rig set up and aligned before drilling.

Auger Drilling

Drilling ahead of the pile through dense ground.

Pile Installation

Pile installed into the pre-bored hole.

Pre-Boring Operation

Auger drilling in progress.